摘要 |
<P>PROBLEM TO BE SOLVED: To prevent omission and mistakes in inspection and to improve efficiency in inspection operation in the inspection of construction such as a bridge. <P>SOLUTION: In this construction inspection recording system 1 using a server 2 which manages inspection information of the construction and a portable terminal 3 which transmits/receives the inspection information via a communication line 6, the portable terminal 3 has: a GPS positional information calculation means 12 for receiving radio waves from a GPS satellite 11 to calculate positional information; a communication means 18 for transmitting/receiving information to/from the server 2; a terminal information recording means 15 for recording the positional information of the construction received from the server 2; a control means 19 for controlling functions of the portable terminal 3; and a display means 16 for displaying the information. The control means 19 decides whether or not the GPS positional information received and calculated by the GPS positional information calculation means 12 is within a predetermined range of the positional information of the construction for inspection, recorded in the terminal information recording means 15 and displays this decision result on the display means 16. <P>COPYRIGHT: (C)2008,JPO&INPIT |