发明名称 METHOD FOR CALCULATING MATERIAL REQUIREMENT PLAN FOR DEMAND INCLUDING A PLURALITY OF DEMAND DATES AND PRIORITY
摘要 <P>PROBLEM TO BE SOLVED: To solve a problem about a formation method of a material requirement plan when priority associated with needs varies as a function showing when the needs are satisfied. <P>SOLUTION: By the disclosed method, a date on which products must be stocked is calculated as to all the components in a supply chain required for satisfying an outlet demand associated with a plurality of time limits and the priority. All the planned product stocks are thus associated with a plurality of stock dates and the relationship priority similarly to all the planned manufacturing starts and all the shipments. <P>COPYRIGHT: (C)2008,JPO&INPIT
申请公布号 JP2007280401(A) 申请公布日期 2007.10.25
申请号 JP20070099732 申请日期 2007.04.05
申请人 INTERNATL BUSINESS MACH CORP <IBM> 发明人 ROBERT A ORZELL
分类号 G05B19/418;G06Q30/06;G06Q50/00 主分类号 G05B19/418
代理机构 代理人
主权项
地址