摘要 |
A manufacturing system includes an event trigger to a primary server and a schedule server, forming a control job by the primary server and the schedule server, checks status (such as an end value trigger) of the primary server with a delay by the schedule server, and validating the status of the primary server with a validation process before the schedule server transmits the control job.
|