发明名称 NUCLEAR POWER PLANT, ITS REMODELING METHOD, AND OPERATION METHOD
摘要 PROBLEM TO BE SOLVED: To reduce expense for remodeling or replacement of a turbine in a nuclear power plant having possibility of increasing a rated heat output in future. SOLUTION: In this nuclear power plant having a nuclear steam supply system for generating steam by fission, and the turbine for recovering energy of steam supplied from the nuclear steam supply system, when steam generated with a higher heat output than the rated heat output by the nuclear steam supply system such as the first turbine efficiency curve 1 is supplied, operation is performed at the rated heat output by using the turbine wherein an energy recovery efficiency is heightened furthermore than the operation time at the rated heat output (point C in figure 1). Thereafter, when the rated heat output of the nuclear steam supply system is increased by 7%, an electric output can be increased by operating at the increased rated heat output after remodeling (point A in figure 1) without remodeling of the turbine or the like. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007248268(A) 申请公布日期 2007.09.27
申请号 JP20060072248 申请日期 2006.03.16
申请人 TOSHIBA CORP 发明人 MIMURA SATOSHI
分类号 G21D1/02;G21D3/00 主分类号 G21D1/02
代理机构 代理人
主权项
地址