摘要 |
The method for rapid installation of a smaller diameter pressure control device usable on an annular BOP or any type of BOP. The step are first installing a flange with a threaded profile upon an annular BOP. Next, install a bell nipple on the flange, then install a first test plug in the base of the BOP or the base of the stack of BOPs. Then install a second test plug into the threaded profile of flange. Perform a pressure test on the flange and all sealing aspects of the annular BOP; depressurizing the flange and removing the test plug. Install a thread protector between flange and the bore of the annular BOP. Next initiate drilling operations; and upon indication of the need for wireline operations, or adapting the existing BOP to smaller working diameter pressure control device, remove the thread protector and install a high pressure assembly.
|