摘要 |
<P>PROBLEM TO BE SOLVED: To solve a problem in which an accurate and quick cost estimate cannot be presented in a state where room planning is not made because CAD data based on design drawing is required in order to carry out the accurate estimate calculation in remodelling a condominium. <P>SOLUTION: When a plurality of floor planning samples designed in advance are used, relation between a construction area S and work volume X for given work parts is calculated by relational expression of X=aS and variation for a coefficient a is in a constant tolerable range, an average value for the coefficient a is a conversion factor A, this conversion factor A is chosen as the coefficient for directly calculating the work volume X from the construction area S. In other words, when the construction area is inputted, the corresponding work volume is automatically calculated using this conversion factor A. The written estimate can therefore be generated and outputted promptly. <P>COPYRIGHT: (C)2007,JPO&INPIT |