发明名称 ESTIMATE CREATION SYSTEM
摘要 <P>PROBLEM TO BE SOLVED: To solve a problem in which an accurate and quick cost estimate cannot be presented in a state where room planning is not made because CAD data based on design drawing is required in order to carry out the accurate estimate calculation in remodelling a condominium. <P>SOLUTION: When a plurality of floor planning samples designed in advance are used, relation between a construction area S and work volume X for given work parts is calculated by relational expression of X=aS and variation for a coefficient a is in a constant tolerable range, an average value for the coefficient a is a conversion factor A, this conversion factor A is chosen as the coefficient for directly calculating the work volume X from the construction area S. In other words, when the construction area is inputted, the corresponding work volume is automatically calculated using this conversion factor A. The written estimate can therefore be generated and outputted promptly. <P>COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007226721(A) 申请公布日期 2007.09.06
申请号 JP20060049964 申请日期 2006.02.27
申请人 SUMITOMO FORESTRY CO LTD;SUMITOMO RINGYO HOME TEC KK 发明人 NISHIHARA YASUHARU;WAKIMURA TATSUO
分类号 G06F17/50;G06Q30/06;G06Q50/00;G06Q50/08 主分类号 G06F17/50
代理机构 代理人
主权项
地址