发明名称 PNEUMATIC CAISSON CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a construction method capable of avoiding environmental influence such as property variation of ground, water quality variation and unstabilization of a structure generated by obstructing an underground water flow and grasping a reality of the situation by an investigation in a construction process of the underground structure. SOLUTION: In a construction process of pneumatic caisson construction method, a reality of the situation and a property of underground water flow is investigated in a work chamber, the underground water flow is once separated via a ground section by an installation of a temporary well and an auxiliary facility, a waterway of the underground water flow is changed by installation of a permanent well and a water passage and then the temporary well is removed. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007211564(A) 申请公布日期 2007.08.23
申请号 JP20060035606 申请日期 2006.02.13
申请人 SHIRAISHI CORP 发明人 KOGA KUMIKO;OUCHI MASATOSHI;NISHIGAKI MAKOTO
分类号 E02D23/04;E02D1/02;E02D23/08;G01J5/48;G01V3/02;G01V9/02;G01V11/00 主分类号 E02D23/04
代理机构 代理人
主权项
地址