摘要 |
PROBLEM TO BE SOLVED: To prevent an increase in the program capacity of a game control means pertaining to the generation and transmission of control commands while curtailing the number of the commands to be transmitted to an electric component control means from the game control means. SOLUTION: Both when the shortage of game balls to be put out is detected and when the game balls should not be put out with the full capacity of a lower tray, a common put-out stoppage designation command is conveyed to a put-out control means from the game control means. In other words, even if the requirements to stop the put-out operation are different, the common command is transmitted to the put-out control means from the game control means. When the requirements for stopping the put-out operation of any kind are established, the put-out control means can be commanded that the put-out operation is not ready by the common control command. This can reduce the load pertaining to the transmission of information to the put-out control means from the game control means. In addition, the form of commands to other control means from the game control means is made common, thereby curtailing the number of the commands. COPYRIGHT: (C)2007,JPO&INPIT
|