摘要 |
PROBLEM TO BE SOLVED: To provide a construction method of a smoke-shielding structure for an elevator landing device capable of constructing the smoke-shielding structure between an upper frame of a jamb frame and a sliding door utilizing the existing jamb frame and suppressing increase of cost and increase of time necessary for construction. SOLUTION: After a door, a door hanger and a hanger case 9 are conveyed from a doorway 3 to a landing 2, a mounting fitting 8 is arranged on the upper frame 5. Then, an inclined smoke-shielding plate 14 is mounted to the mounting fitting 8 and the hanger case 9 is further mounted to the upper frame 5 through the mounting fitting 8. Further, after the door hanger 11 is hangingly provided on the hanger case 9, the door 7 is mounted to a lower end of the door hanger 11 through a contact plate 15. COPYRIGHT: (C)2007,JPO&INPIT
|