发明名称 SHUTDOWN SUPPORT SYSTEM FOR POWER SYSTEM EQUIPMENT AND METHOD THEREOF
摘要 <P>PROBLEM TO BE SOLVED: To provide a shutdown support system for power system equipment and a method thereof, rapidly and securely adjusting work planning against power failure without causing a problem with a safety protection in executing the work planning. <P>SOLUTION: The system includes a power failure work request section terminal, a work approval section terminal, a work site portable terminal, and a power failure work management system. The power failure management system is composed of a power failure work management server and a power failure work database. The power failure work request section terminal includes a data input and output device relating to the power failure work planning. The work approval section terminal includes the data input and output device relating to the determined power failure work planning. The work site portable terminal includes the input and output device for implementing and reporting the data relating to the decided power failure work planning. The power failure work management server of the power failure work management system is connected to a data-communication network having the device for creating, storing and transmitting the power failure work planning data based on the data relating to the power failure work input from the power failure work request section terminal and the work approval section terminal and the power failure work database. <P>COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007189822(A) 申请公布日期 2007.07.26
申请号 JP20060005271 申请日期 2006.01.12
申请人 CHUGOKU ELECTRIC POWER CO INC:THE 发明人 TANAKA TAKAAKI
分类号 H02J3/00;G06Q50/00;G06Q50/06;G06Q50/10 主分类号 H02J3/00
代理机构 代理人
主权项
地址