发明名称 PROGRAM AND CREW SCHEDULE PLANNING DEVICE
摘要 <P>PROBLEM TO BE SOLVED: To obtain a device for obtaining a proper crew schedule plan. <P>SOLUTION: In a first crew schedule plan, a crew schedule network is generated based on a train timetable or the like (step S1), and basic costs are set in each arc of the crew schedule network based on a predetermined evaluation reference (step S3). Also, the minimum cost complete matching of nodes included in the crew schedule network is calculated (step S5), and the sieving of courses is operated based on the irreducible costs of each arc calculated in the process (step S7). Then, set partitioning solutions are retrieved from among the courses remaining after the sieving (step S9), and the retrieved set partitioning solutions are defined as a crew schedule plan. <P>COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007188222(A) 申请公布日期 2007.07.26
申请号 JP20060004848 申请日期 2006.01.12
申请人 RAILWAY TECHNICAL RES INST 发明人 SAKAGUCHI TAKASHI;FUKUMURA NAOTO;TOMII NORIO
分类号 B61L27/00;G06Q10/00;G06Q10/06;G06Q50/00;G06Q50/30 主分类号 B61L27/00
代理机构 代理人
主权项
地址
您可能感兴趣的专利