发明名称 FAILURE REASON ANALYSIS SYSTEM
摘要 A system and a method for managing a process are provided to solve delay of each work/manager in a construction project by checking the delay generated from each company, manager, and work group, and causes of the delay, and efficiently manage the process by rebuilding a work plan based on the checked delay and causes. A database server(110) classifies and stores manager information managing the construction project, the work plans, and work lists. Each manager terminal(120) is connected to the database server, and transmits a work result of each work field according to a daily work order form. An operator server(130) transmits the daily work order form according to the work plan to the manager terminals and calculates work reliability comparing work amount included in the daily work order form with the performed work amount. If the work reliability is not 100 percents, the operator server rebuilds the work plan by mapping the process and transmits the rebuilt work plan to the database server. The manager terminal is a PC, a PDA(Personal Digital Assistant), or a mobile terminal.
申请公布号 KR20070077159(A) 申请公布日期 2007.07.25
申请号 KR20070062090 申请日期 2007.06.25
申请人 KWANGWOON UNIVERSITY RESEARCH INSTITUTE FOR INDUSTRY COOPERATION;SEOUL NATIONAL UNIVERSITY INDUSTRY FOUNDATION 发明人 KIM, CHANG DUK;YU, JUNG HO
分类号 G06Q50/08;G06Q10/06 主分类号 G06Q50/08
代理机构 代理人
主权项
地址