发明名称 INVERT SUBGRADE CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide an invert subgrade construction method suitable for the shield jacking excavation of a long-distance large-bore tunnel even in the sediment ground containing gravel in the tunnel excavated ground, taking out working face excavated mud to the ground by a conventional method, backfilling part of the taken-out mud in a batch manner into an invert part to form a strong subgrade with uniform density. SOLUTION: This invert subgrade construction method is characterized in that solidifying agents 5, 6 are added in discharged excavated mud 4 for primary reforming to take out the mud onto the ground, and then secondary reforming is performed to backfill the mud into the invert part 8 to form the subgrade 9 in tunnel excavation work wherein the working face 2 of the tunnel 1 is jacked by a mud pressurizing shield machine 3. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007162403(A) 申请公布日期 2007.06.28
申请号 JP20050362686 申请日期 2005.12.16
申请人 FUJIKI:KK;HANSHIN EXPRESSWAY CO LTD;KANKYO SHIZAI KAIHATSU KK 发明人 FUJITA IWAHIKO
分类号 E21D11/00 主分类号 E21D11/00
代理机构 代理人
主权项
地址