发明名称 CARRIER CONSTRUCTION METHOD OF DOUBLE TRACK TUNNEL
摘要 A construction method for an intermediate support of a double-track tunnel is provided to make construction simple and to reduce the cost required for construction and maintenance by excluding the necessity for constructing a pilot tunnel for installing an intermediate support and to secure stability by preventing the transfer of impact and vibration caused by blasting or crushing work of a main tunnel. The construction method for an intermediate support of a double-track tunnel comprises the steps of forming a perforated hole(11) to a foundation layer(101) located on the lower part of a double-track tunnel by perforating the center of a stratum(100) between double-track tunnels using an auger screw(12)(S11), placing foundation mortar(13) up to the height corresponding to one third of the length of the perforated hole from the lower part of the perforated hole to have foundation-bearing capacity(S12), inserting a pile(14) to the perforated hole filled with foundation mortar(S13), placing support mortar(15) on the circumference of the pile inserted to the perforated hole to secure friction bearing capacity(S14), and hardening the foundation mortar and the support mortar(S15).
申请公布号 KR100731573(B1) 申请公布日期 2007.06.18
申请号 KR20060132560 申请日期 2006.12.22
申请人 HIGHCON CONSTRUCTION ENGINERING CONSULTANTS 发明人 YOON, GYEONG SEOG
分类号 E21D11/00 主分类号 E21D11/00
代理机构 代理人
主权项
地址