发明名称 METHOD OF CONSTRUCTION FOR PROMOTING DRAIN BY VACUUM AND PRESSURE, AND DRAIN PIPE THERE OF
摘要 A vacuum consolidation drainage method using a drainpipe is provided to discharge a large quantity of underground water and to prevent the deformation of a drain board against earth pressure by installing a drainpipe which inhales and drains off underground water compulsively using vacuum pressure. The invention relates to a vacuum consolidation drainage method using a drainpipe for discharging the underground water, gathered in a drain board(310) after inhaling and filtering through a filter layer(320) of non-woven fabrics using a vacuum pump(400) connected to a drain connector(500), to the outside of the ground through a drainpipe(30) installed in the drain board using vacuum pressure, wherein support ribs are formed on the outer circumferential surface of the drainpipe at regular intervals to prevent the deformation of the drain board by earth pressure, through holes are formed on the outer circumferential surface of the drainpipe to increase the discharge quantity of underground water and to shorten the time required for discharging underground water respectively, and a packing is installed to the inside of the bottom of the drain board to make the inside of the drain board vacuous.
申请公布号 KR100729567(B1) 申请公布日期 2007.06.12
申请号 KR20060070181 申请日期 2006.07.26
申请人 DAEHAN I.M. CO., LTD. 发明人 YOON, YOON MO
分类号 E02D3/10 主分类号 E02D3/10
代理机构 代理人
主权项
地址