发明名称 SYSTEM AND METHOD FOR FORECASTING STARTING SCHEDULE OF STEAM TURBINE PLANT, PROGRAM FOR FORECASTING AND RECORD MEDIUM STORING PROGRAM
摘要 PROBLEM TO BE SOLVED: To provide a system and a method for forecasting starting schedule capable of forecasting starting schedule of a steam turbine and a boiler even during operation and minimizing loss at a time of start by utilizing the result. SOLUTION: The system 1 for forecasting starting schedule of the steam plant is provided at least with an input device 4 inputting at least parallel off plan date and a parallel plan date, a data storage part 3 storing operation result data in the past, and a simulation control part 2 determining turbine start time based on a formula forecasting temperature of a predetermined section during stop of a turbine, defining boiler ignition time with setting determined start time as an origin based on the formula forecasting temperature of the predetermined section during stop of the boiler and a formula forecasting required start time from start of the turbine by the forecasted temperature, and converging the provided boiler ignition time to a fixed value by correcting ignition timing by repeating the same operation. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007138856(A) 申请公布日期 2007.06.07
申请号 JP20050335137 申请日期 2005.11.21
申请人 CHUGOKU ELECTRIC POWER CO INC:THE 发明人 SHIMIZU TETSUO
分类号 F01D19/00 主分类号 F01D19/00
代理机构 代理人
主权项
地址