发明名称 METHOD OF MANAGING FACING OF TUNNEL USING SPRING WATER PRESSURE
摘要 PROBLEM TO BE SOLVED: To provide a method of managing the facing of a tunnel using a spring water pressure on the basis of the level and pressure of underwater around the facing together with the physical properties of a natural ground. SOLUTION: In this method of managing the facing of the tunnel using the spring water pressure, the presence or absence of underground water is checked and the spring water pressure is measured at the front of the facing of the tunnel repeatedly each time the facing advances by a predetermined distance. When the spring water pressure exceeds a specified value when it is measured or the amount of the spring water is large, a tunneling construction is suspended and draining is performed. After it is confirmed that the level and pressure of underwater are sufficiently lowered, the tunneling construction is re-started. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007113333(A) 申请公布日期 2007.05.10
申请号 JP20050307916 申请日期 2005.10.24
申请人 RAILWAY TECHNICAL RES INST;JAPAN RAILWAY CONSTRUCTION TRANSPORT & TECHNOLOGYAGENCY 发明人 KITANI HIDEO;OTA TAKEHIRO;HASEGAWA ATSUSHI;TOYOHARA MASATOSHI;YODA JUNICHI
分类号 E21D9/04 主分类号 E21D9/04
代理机构 代理人
主权项
地址