发明名称 CHANNEL BRIDGE CONSTRUCTION METHOD AVAILABLE TO CONTROL CHANNEL BRIDGE SEGMENT SAG
摘要 A construction method of a channel bridge for correcting sag is provided to construct the channel bridge securely and accurately by longitudinally prestressing U-shaped segments in restricting subsidence of the U-shaped segments supported in a temporary beam. Temporary beams(320) are longitudinally and successively installed on a temporary lower structure(310) with temporary bents spaced longitudinally, and a rail member(323) is mounted in the temporary beam. A lifting unit(400) with a hydraulic jack is installed in an upper part of a trolley(330) moving along the rail member, and a U-shaped segment(100) is loaded in the trolley and directly supported in the lifting unit. Plural U-shaped segments are integrally connected by pushing the trolley forward along the temporary beam, and sag of the U-shaped segment is corrected by operating the lifting unit. A tendon(500) penetrating the U-shaped segments is strained and fixed to support a lower bridge structure with the U-shaped segments. The U-shaped segment is supported in the lifting unit, and moved along the rail member of the temporary beam with the trolley.
申请公布号 KR100699413(B1) 申请公布日期 2007.03.23
申请号 KR20060039566 申请日期 2006.05.02
申请人 发明人
分类号 E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址