发明名称 SC STRUCTURE AND ITS CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To manufacture a steel plate block including a tie-bar in a factory, to dispose an apparatus buried article easily on the site, to thereby facilitate construction, and to reduce a manufacturing product amount and a connection work amount on the site. SOLUTION: A pair of facing steel plates 11 with studs are connected together with many tie-bars 12 disposed between the plates, to thereby manufacture the steel plate block 13 in the factory. In this case, at least a part of tie-bars 12 are connected detachably by bolt fastening or the like. Tie-bars 12 on necessary spots are mounted on internal space parts of the steel plate block 13, and the apparatus buried article such as a wire conduit 14 is disposed on the site. Then, concrete 15 is filled. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007064636(A) 申请公布日期 2007.03.15
申请号 JP20050247077 申请日期 2005.08.29
申请人 TOSHIBA CORP 发明人 HIRAI HIDEO
分类号 G21C13/00;E04B1/16 主分类号 G21C13/00
代理机构 代理人
主权项