摘要 |
PROBLEM TO BE SOLVED: To improve working efficiency by reducing the insertion force of a sub-connector. SOLUTION: A second sub-connector 10B is inserted from a receptacle 60A of a frame 60 to a connector storage chamber 66. In the insertion process, a second lock 19 of the second sub-connector 10B passes a first lock receiver 63 without interfering with the first lock receiver 63 of the frame 60. When the second sub-connector 10B is fitted normally, the second lock 19 is subjected to convex and concave engagement to a second lock receiver 62 of the frame 60, and the second sub-connector 10B is set to a detachment preventive state into the frame 60. After that, a first sub-connector 10A is inserted from the receptacle 60A to the connector storage chamber 66. A first lock 21 of the first sub-connector 10A is subjected to convex and concave engagement to the first lock receiver 63 of the frame 60, and the first sub-connector 10A is held in a detachment preventive state in the frame 60 side by side with the second sub-connector 10B. COPYRIGHT: (C)2007,JPO&INPIT
|