发明名称 METHOD FOR RECOVERY FROM ACCIDENT IN DISTRIBUTION LINE SYSTEM, AND POWER DISTRIBUTION CONTROL DEVICE
摘要 <P>PROBLEM TO BE SOLVED: To provide a method for recovery from an accident in a distribution line system, wherein a distribution line will not be overloaded during recovery from an accident. <P>SOLUTION: The method for recovery from an accident is for a distribution line system, in which any one of multiple sections of a distribution line partitioned by multiple section switches can be linked with a distributed power supply. Each load on multiple sections of a distribution line and the allocable capacity of the distribution line, with respect to a substation for power distribution, are determined in advance. After a distributed power supply is paralleled off and multiple section switches are opened at an accident in the distribution line, each of the multiple section switches is instructed to turn on, in a predetermined order of turn-on by a power distribution control device that monitors and controls the section switches and the distributed power supply. At this time, the total of the loads in the sections of the distribution line in which one section switch is turned on and to which power is supplied from the substation for power distribution is compared with the allowable capacity of the distribution line. When the total of the loads does not exceed the allowable capacity, the relevant section switch is instructed to be turned on. When the total of the loads exceeds the allowable capacity, the relevant section switch will not be instruct to be turned on. <P>COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007028769(A) 申请公布日期 2007.02.01
申请号 JP20050206016 申请日期 2005.07.14
申请人 CHUGOKU ELECTRIC POWER CO INC:THE 发明人 MISHIMA KIYOSHI
分类号 H02J13/00;H02J3/00;H02J3/38 主分类号 H02J13/00
代理机构 代理人
主权项
地址