发明名称 CONSTRUCTION METHOD OF BREAST WALL FOR TREE PLANTING
摘要 A construction method of a vegetation retaining wall is provided to increase constructing speed and continually keep the structural function and strength of the retaining wall without using the concrete and reinforcing bars. A construction method of a vegetation retaining wall(1) is composed of a step of pouring a geogrid(30) made of a synthetic resin material; a step of laminating a vegetation pack(50) or a vegetation sack at the lower side of the front of the geogrid and placing the geogrid on the upper surface of the vegetation pack or the vegetation sack; a step of installing the molded frame whose upper and lower ends are opened, setting a soil sack(10) whose upper end is opened, and filling a soil(11) inside; a step of removing the molded frame and firstly pouring/hardening a soil(41); and a step of secondly pouring a soil(42) from the rear of the soil sack to the upper end of the soil sack. The whole process is consecutively repeated to set height of the retaining wall.
申请公布号 KR100679873(B1) 申请公布日期 2007.02.01
申请号 KR20060042207 申请日期 2006.05.11
申请人 SUH, DONG SOO;KIM, KWANG HO 发明人 SUH, DONG SOO;KIM, KWANG HO
分类号 E02D29/02 主分类号 E02D29/02
代理机构 代理人
主权项
地址