Methods and tools are described to reduce sanding including the steps of fracturing the cement sheath (13) in a localized zone around the casing (111) and having the fractured zone act as sand filter between the formation and openings (113) in the casing (111), with the openings being best pre-formed but temporarily blocked so as to allow a conventional primary cementing of the casing. The fracturing step can also be used for remedial operation to reopen blocked formation or screens.
申请公布号
CA2615972(A1)
申请公布日期
2007.01.25
申请号
CA20062615972
申请日期
2006.07.19
申请人
SCHLUMBERGER CANADA LIMITED;PRAD RESEARCH AND DEVELOPMENT N.V.