发明名称 METHOD AND STRUCTURE FOR BRIDGE PIER MOULD CONSTRUCTION USING CONCRETE WATER BARRIER
摘要 A bridge pier construction method using a reinforced concrete cutoff barrier and a cutoff barrier structure for a bridge pier are provided to improve waterproof efficiency by installing a water swelling stopper between a cutoff barrier and a bridge pier shoe. A cutoff barrier structure(200) for a bridge pier comprises a concrete material(230) integrally connected to an inner peripheral surface of a bridge pier shoe(10) with an anchor member, corresponded to an inner peripheral surface of a void; upper and lower reinforcing bars(210) separately installed at upper and lower parts inside the concrete material. A plurality of upper and lower reinforcing bars are crossly installed in a lattice shape, and the upper reinforcing bars are installed more densely than the lower reinforcing bars. More than one block member with a through-hole communicating the upper part and the lower part are mounted in the concrete material. The water swelling stopper is mounted between a rim of outer peripheral surface of a cutoff barrier and the inner peripheral surface the bridge pier shoe.
申请公布号 KR100676416(B1) 申请公布日期 2007.01.24
申请号 KR20060042887 申请日期 2006.05.12
申请人 SSANGYOUNG ENGINEERING & CONSTRUCTION CORPORATION 发明人 KWON, HYUCK JIN;CHO, KEON WOONG;KIM, HO BUM
分类号 E02D23/02;E02D27/04 主分类号 E02D23/02
代理机构 代理人
主权项
地址
您可能感兴趣的专利