发明名称 CONSTRUCTION METHOD OF SHIELD TUNNEL INSIDE ROAD HAVING WIDTH EXPANDED PART AND SEGMENT USED THEREFOR
摘要 PROBLEM TO BE SOLVED: To construct a road having a width expanded part in a shield tunnel, without impairing stability of the outer peripheral ground, by restraining high pressure water injected into the outer peripheral ground for excavating the outer peripheral ground of the shield tunnel from acting on the outer peripheral ground over a wide range. SOLUTION: This construction method of the shield tunnel inside road having the width expanded part constructs the shield tunnel by using a plurality of width expanding segments arranged in a side wall part of the shield tunnel, a clearance forming means and a seal means arranged between the width expanding segments and a segment adjacent to the segments. A sheet pipe is inserted into clearance generated by removing the clearance forming means, and the sheet pile is pushed out to the outer peripheral ground of the shield tunnel, and while excavating the outer peripheral ground between the sheet piles by an excavating means via the width expanding segments, the width expanding segments are pushed out to the outer peripheral ground of the shield tunnel, and afterwards, the road having the width expanded part is constructed in the shield tunnel. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007009562(A) 申请公布日期 2007.01.18
申请号 JP20050192591 申请日期 2005.06.30
申请人 KUMAGAI GUMI CO LTD 发明人 YAMAMORI NORIYASU
分类号 E21D9/06;E21D11/00 主分类号 E21D9/06
代理机构 代理人
主权项
地址