摘要 |
The present invention relates to the automatic construction of buildings or other heavy constructions by a method and a device suitable for reducing the construction time and for assisting its relative operations. This method comprises the steps of CAD- modelling a structure through volume or surface modelling steps, sectioning the structure computed model with horizontal parallel planes according to a predetermined pitch, prearranging an apparatus that deposits in alternation a layer of granular material and a liquid binder only in coincidence with the solid portions of said plane, within containing walls that define a closed perimeter. This method can be carried out by an apparatus having a horizontal frame (1) suitable for supporting a bridge crane (15) capable of causing and operating head to move (16) in a horizontal plane defined by said horizontal frame (1) . The frame (1) is movable along four uprights (3, 4, 5, 6) vertically (11,12,13,14), the bridge crane (15) is sliding horizontally (18) , and the operating head is sliding horizontally (19) . |
申请人 |
DINI, ENRICO;NANNINI, ROBERTO;CHIARUGI, MORENO |
发明人 |
DINI, ENRICO;NANNINI, ROBERTO;CHIARUGI, MORENO |