摘要 |
FIELD: building, particularly finishing works. ^ SUBSTANCE: method involves fastening corbels to surface to be plastered; extending thread between the corbels; staking out plane; arranging screed marks, which are used as bases for future screeds and forming screeds of mortar. String made of steel wire or thin cable may used as the thread. The thread is used as indirect screed reinforcement during plastering operation and defines screed top. The thread leans against hardening mortar without thread deflection, wherein the mortar is applied on tightened thread so that mortar heap is created. Then the mortar heap projecting over the thread is cut as mortar passes from liquid to solid state. ^ EFFECT: increased accuracy, labor productivity due to combination of wall plane staking out operation with screed making operation and simplified staking out operation. ^ 6 dwg |