摘要 |
An overhang bracket has a top member, a side member and a diagonal member. The side and top member may be connected together through a removable connecter. A guardrail post holder allows a guardrail post to be installed at a variety of angles to the top member. Rotating the side member causes the diagonal member to translate up or down the side member. A side member locator extends upwards from the overhang bracket to indicate the location of the side member. A tie rod holder holds a tie rod in an offset position relative to the side member. The side member locator may extend upwards through further parts of the shoring system or bridge overhang structure, for example a floor of a concrete form or rebar. A worker may adjust the overhang bracket in place from a standing position on a supporting structure or the floor of the form.
|