发明名称 PROCEDIMIENTO PARA LA INCORPORACION DE CAMBIOS DE AGUJAS EN CARRILES FERROVIARIOS, ASI COMO CAMBIO DE AGUJAS PARA LLEVAR A CABO ESTE PROCEDIMIENTO.
摘要 A method for installing railway switches in tracks is characterized in that the switch completely preassembled in functional units ( 1, 2, 7, 18 ) is transferred onto a transport vehicle, and that the tongue region, the rail interspace region and the core region including preassembled sleepers ( 6, 18 ), the movable switch parts such as, e.g., the tongue device and the safety devices are lowered on the installation site in the preassembled state and connected with the adjoining rails, whereupon the switch is ballasted and the track ballast is packed, the connection ducts for the switch mechanism and the switch safety devices are connected and the switch is put into operation. In the railway switch capable of being transported in the preassembled state, the actuating drives are designed as hydraulic actuators ( 3, 4, 5 ). The hydraulic lines ( 6 ) for the connection of the actuating drives are elastically fixed to the sleepers ( 18 ). The actuating drives ( 3, 4, 5 ) are connected to the movable switch parts such as, e.g., tongues ( 2 ) in a manner pivotable about an axis extending in the longitudinal direction of the rails with elastic connection elements and/or crowned bearings ( 8, 9 ) being interposed.
申请公布号 ES2264478(T3) 申请公布日期 2007.01.01
申请号 ES20020724034T 申请日期 2002.05.07
申请人 VAE EISENBAHNSYSTEME GMBH;VAE GMBH 发明人 ACHLEITNER, HERBERT;SCHNEDL, KARL;HORTLER, JOSEF;BERLIZ, GERHARD
分类号 B61B3/00;E01B7/00;A63G21/04;B61B7/00;B61B11/00;B61B12/02;E01B1/00;E01B7/02;E01B25/18;E01B25/24;E01B29/00;E01B29/02 主分类号 B61B3/00
代理机构 代理人
主权项
地址