摘要 |
PROBLEM TO BE SOLVED: To provide an easily performable moving construction method, without weakening a foundation, in an undamaged moving construction method of a building foundation. SOLUTION: In this undamaged moving construction method of the building foundation, clearance (a) is formed by sandwiching an interposing material 4 between a sill of a building and the foundation; a small reinforcing steel material 5 is inserted into the clearance (a); an end part of the small reinforcing steel material 5 is inserted and fixed inside a cylindrical shape in an end part of a large reinforcing steel material 6 of a cylindrical shape; a jack and a pressure-proof board under the jack are respectively arranged in a lower part of the large reinforcing steel material 6; and the building 1 is lifted or lifted and further moved by driving the jack. COPYRIGHT: (C)2007,JPO&INPIT
|