摘要 |
A WBS design managing means in project management, comprising: a WBS tree-like architecture designing means for implementing graphical tree-like design of the work items included in a project and their relations, and mapping them into an enhanced WBS data structure; a WBS attribute editing means for defining and editing attributes of work items at each node of the tree-like architecture; and a WBS data managing means for storing and managing data constructed in accordance with said enhanced WBS data structure. The WBS design managing means may connect to a converter for converting said constructed data into the format required by a project management tool so as to input said structured data to the project management tool. Besides, there is provided an enhanced WBS design tool. The present invention makes the system design tool and project management tool be integrated, so that the system architect and the project management personal have more fluent channel for information exchange under the support of the present invention's tool, improving efficiency and accuracy of project management.
|