摘要 |
<P>PROBLEM TO BE SOLVED: To make a correspondence capable to the occurrence time of a trouble and system switching or the like in advance capable, by analyzing right or wrong and the like of power transmission relating to a sound power interruption interval when the trouble occurs for the present load condition. <P>SOLUTION: Referring to a system data base 14, from a load of a distribution line input from a remote supervisory control unit 10, the load of each interval belonging to the distribution line is generated in an interval load data storage area 13, additionally extraction 15 of a trouble occurrence interval is executed with possibility capable of generating a power transmission procedure to the sound power interruption interval except a trouble interval when the trouble occurs, to make an analysis objective system 16. Relating to each of this interval, on the basis of an interval load data of the interval load data storage area 13, analysis 17 is performed of right or wrong of generation of the power transmission procedure satisfying a voltage/current condition, and this analyzed result is displayed in a display device 20. <P>COPYRIGHT: (C)2007,JPO&INPIT |