摘要 |
<P>PROBLEM TO BE SOLVED: To provide a cogeneration system making automatic correction of time and date at the return of power even if a clocking means of the cogeneration system stops due to the occurrence of electric service interruption. <P>SOLUTION: The cogeneration system 1 has a load result data storage means 5 for totaling and storing load result data of one day according to the attributes of the day, and a control device 6 for reading load result data coinciding with the attribute of a specific day from the load result data storage means 5 and optimizing an operation schedule of the specific day based on the load result data. The cogeneration system 1 comprises a power return time correcting means 7 for writing correct time in the control means 6 when the control means 6 is stopped by service interruption and then restarted by the return of power. <P>COPYRIGHT: (C)2007,JPO&INPIT |