发明名称 PRODUCTION PLAN DECISION METHOD
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a production plan decision method for maximizing productivity while satisfying inter-process time restriction, and for improving a facility operation rate while attaining the interruption of a preferential lot. <P>SOLUTION: In the production plan of a lot where a plurality of processes to be processed are defined according to models, and inter-process time restriction is set, a start adjustment time in each process of this lot is calculated in a step S1, and a neck process is detected, and the dispatching to the leading process of the lot is determined based on the neck process detected by the step S1 in a step S2, and the processing plan of the lot in each process of the lot is prepared on the basis of the dispatiching to the leading process of the lot determined by the step S2 in a step S3 so that it is possible to improve a facility operation rate. <P>COPYRIGHT: (C)2007,JPO&INPIT</p>
申请公布号 JP2006330820(A) 申请公布日期 2006.12.07
申请号 JP20050149561 申请日期 2005.05.23
申请人 MITSUBISHI ELECTRIC CORP 发明人 KISHIMOTO HIROKICHI;INUI KENTARO;MORISAWA KENJI;ISACHI HIDEKI
分类号 G05B19/418;G06Q50/00;G06Q50/04 主分类号 G05B19/418
代理机构 代理人
主权项
地址