摘要 |
PROBLEM TO BE SOLVED: To provide a turbine system and its construction method, capable of flexibly producing energy and water in response to respective demands. SOLUTION: This turbine system has a gas turbine facility 10, a steam generating facility 20 for generating steam by using exhaust gas (e) from this gas turbine facility 10 as a heat source, a steam turbine facility 30 for providing rotational motive power by the steam (i) from this steam generating facility 20, and a water manufacturing facility 40 for providing pure water (n) by distilling raw water (m) by using the steam (i) from the steam generating facility 20. COPYRIGHT: (C)2007,JPO&INPIT
|