摘要 |
PROBLEM TO BE SOLVED: To provide a verge tile and a construction structure of the verge tile enabling a reduction in cost without parting operations and further enabling the safe construction work for the verge tile. SOLUTION: A projected part 6c is formed integrally with the verge tile 6 formed in L-shape in cross section by a covering portion 6a covering a flat tile 3 and a suspended portion 6b suspended from the covering portion 6a. The verge tile 6 is constructed by putting the projected part 6c on a plate material 5 fixedly installed on the verge-rafter finished surface 4a side of a tile stiffener 2. A space S for inserting a decorative material therein is formed between the suspended portion 6b and a verge-rafter finished surface 4a. COPYRIGHT: (C)2007,JPO&INPIT
|