摘要 |
A ground heaping structure using a landscape architecture stone and a construction method for the same are provided to stably maintain the mounting state of the landscape architecture stone, and stably support the landscape architecture stone. A ground heaping structure using a landscape architecture stone comprises a gravity-type reinforced soil, a concrete part(12), a base stone(20), upper stones(22,24), and a drain layer(36). As plural layers of compacted soil(30,32,34) are accumulated on the ground(5), a slope is generated at one side. The gravity-type reinforced soil comprises the compacted soil and a plurality of reinforcing materials inserted between the respective compacted soil at regular intervals. At least one of the concrete part is inserted in a groove formed on the ground. The base stone is fixed by the reinforcing material and a turn-buckle/anchor-bolt set(42). The upper stone is contacted with the reinforced soil by a lower part thereof. The drain layer is formed on the front of the slope of the reinforced soil. A construction method for the structure comprises steps of supporting the base stone, heaping up the compacted soil, forming the drain layer, fixing a geogrid(40) to the compacted soil and the base stone, arranging the upper stone, filling a space between the upper stone and the base stone with mortar, mounting a Sam's anchor(50), and mounting at least one layer of the base stone and the upper stone. |