发明名称 |
PBD EXECUTION EQUIPMENT AT SEA AND PBD EXECUTION METHOD FOR OPERATING HE SAME |
摘要 |
A construction system for a marine PBD(plastic board drain) is provided to shorten a period of construction for a PBD by moving and constructing a PBD quickly on the bottom of the sea. A construction system(100) for a marine PBD(plastic board drain) comprises: a hull(200) moving in a working area for PBD installation, and having a through hole(210) to insert a PBD to the bottom of the sea along a PBD driving crane and a body guide(220) to guide the horizontal movement of a PBD driving crane, winches(230) with a winch wire(240) to move the hull floating on the sea and a spud(250) to keep the hull not to be shaken by waves; and a PBD driving crane(300) having a leader master(320) coupled with many angles and formed in a long structure, a placer(340) placed on the lower right side of the leader master to place a PBD on the bottom of the sea and a crane body(360) connected with the placer and the leader master to support the load of the placer and the leader master. |
申请公布号 |
KR100652205(B1) |
申请公布日期 |
2006.11.23 |
申请号 |
KR20050106370 |
申请日期 |
2005.11.08 |
申请人 |
GTE CONSTRUCTION CO., LTD. |
发明人 |
HER, TAE YOUNG;BAI, BYUNG GAP |
分类号 |
E02D3/10 |
主分类号 |
E02D3/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|