发明名称 PBD EXECUTION EQUIPMENT AT SEA AND PBD EXECUTION METHOD FOR OPERATING HE SAME
摘要 A construction system for a marine PBD(plastic board drain) is provided to shorten a period of construction for a PBD by moving and constructing a PBD quickly on the bottom of the sea. A construction system(100) for a marine PBD(plastic board drain) comprises: a hull(200) moving in a working area for PBD installation, and having a through hole(210) to insert a PBD to the bottom of the sea along a PBD driving crane and a body guide(220) to guide the horizontal movement of a PBD driving crane, winches(230) with a winch wire(240) to move the hull floating on the sea and a spud(250) to keep the hull not to be shaken by waves; and a PBD driving crane(300) having a leader master(320) coupled with many angles and formed in a long structure, a placer(340) placed on the lower right side of the leader master to place a PBD on the bottom of the sea and a crane body(360) connected with the placer and the leader master to support the load of the placer and the leader master.
申请公布号 KR100652205(B1) 申请公布日期 2006.11.23
申请号 KR20050106370 申请日期 2005.11.08
申请人 GTE CONSTRUCTION CO., LTD. 发明人 HER, TAE YOUNG;BAI, BYUNG GAP
分类号 E02D3/10 主分类号 E02D3/10
代理机构 代理人
主权项
地址