摘要 |
FIELD: railway transport; repairs. ^ SUBSTANCE: method of optimum assembling of friction set of bogie, Model 18-100, when putting out cars after scheduled repair includes measuring of distance between friction strips of side frames, determining completeness of overspring beams and mounting of friction wedges. Friction wedges are subdivided into six size groups and, when assembling the bogie, after measuring distance between friction strips at the top and completeness of overspring beam, having determined difference of said values, wedges of corresponding size group are chosen and installed to provide normalized position of wedges for friction set. ^ EFFECT: provision of normalized position of wedges of friction sets, putting out of car after repair in due time, prevention of failures in service. ^ 3 tbl, 2 dwg |