发明名称 CLIMBING CRANE SUPPORTING METHOD
摘要 PROBLEM TO BE SOLVED: To provide a climbing crane supporting method favorably applicable for construction of RC structured building. SOLUTION: In this climbing crane supporting method, when constructing a multistory building of reinforced concrete structure by installing a climbing crane on the top of a constructed building frame and gradually relocating it upward with progress of construction, a precast concrete column 10 is used as a pillar of the building to be built, and brackets 11 for temporarily supporting main body receiver beams 4 (4a and 4b) are previously provided in a side surface of the precast concrete columns of the highest story. When temporarily supporting a crane main body 2 in climbing on the highest story of the constructed building frame, the crane main body 2 is temporarily supported by the brackets 11 through the main body receiver beams 4. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2006298556(A) 申请公布日期 2006.11.02
申请号 JP20050122181 申请日期 2005.04.20
申请人 SHIMIZU CORP 发明人 FURUGUCHI HIKARI;YAMAZAKI SHINOBU;MAEDA NOBUYUKI;TAKAHASHI HIROSHI
分类号 B66C23/32 主分类号 B66C23/32
代理机构 代理人
主权项
地址