发明名称 BORED CAST-IN-PLACE STEPPED FOUNDATION AND ERECTION METHOD
摘要 FIELD: building, particularly to erect bored cast-in-place foundations of increased load-bearing abilities including ones having bottom marks typical to shallow foundations. ^ SUBSTANCE: stepped foundation comprises bored cast-in-place sections formed with the use of auger. Lower foundation step includes four peripheral cylinders of Dp.l. diameters and heights equal to above diameters. Peripheral cylinder centers are located at apexes of square having side lengths equal to Dp.l.. Square center coincides with center of support. Central support abutting four peripheral cylinders of lower foundation step has four expanded parts with Dc.exp diameters determined as Dc.exp=(1.0-1.2)Dp.l. and cylindrical bore having diameter Dp.up determined as Dp.up=(0.6-0.8)Dp.l.. Foundation bottom is 0.7 m below ground surface. Foundation erection method involves forming drilled pile sections; serially drilling wells having daug.1 diameters as each peripheral cylinder having Dp.l. is forming; creating each peripheral cylinder having height equal to Dp.l. by supplying working material for above cylinder forming; filling remainder well section with ground material, particularly with ground excavated from above object. Auger having diameter, which provides necessary Dp.l. diameter is used. The auger provides usage of technological processes, which provides 1.05-1.1 increase of pile diameter in comparison with auger diameter daug.1 and 1.1-1.2 increase of ground pile diameter in comparison with daug.1 diameter. After four peripheral cylinders of lower foundation step creation well having daug.2 diameter is drilled by means of direct auger rotation and ground excavation to day surface. The well has center coinciding with central support center and depth selected so that the well reach tops pf peripheral lower step cylinders. Then lower expanded part of central support is formed, wherein the expanded part has expansion degree Bc.exp./daug.2 equal to 1.5-2.0. During cylindrical bore drilling the expanded part has expansion degree Dp.up/daug.2 equal to 1.2-1.5. ^ EFFECT: increased load-bearing capacity per foundation volume unit, extended field of technical means. ^ 3 cl, 4 dwg
申请公布号 RU2286424(C1) 申请公布日期 2006.10.27
申请号 RU20050113805 申请日期 2005.05.05
申请人 GOSUDARSTVENNOE OBRAZOVATEL'NOE UCHREZHDENIE VYSSHEGO PROFESSIONAL'NOGO OBRAZOVANIJA "SEVERO-KAVKAZSKIJ GOSUDARSTVENNYJ TEKHNICHESKIJ UNIVERSITET" 发明人 STOLJAROV VIKTOR GAVRILOVICH
分类号 E02D27/01 主分类号 E02D27/01
代理机构 代理人
主权项
地址
您可能感兴趣的专利