摘要 |
PROBLEM TO BE SOLVED: To enable cleanup work after discharging to be greatly simplified by covering a major portion of a wall around hold with wall sheets. SOLUTION: Sheets 1 for hold are composed of a starboard wall sheet 7, a port wall sheet 8, a bow wall sheet 9, and a stern wall sheet 10. Respective wall surfaces 3, 4, 5, 6 are not flat but recessed and projected, so respective wall sheets 7, 8, 9, 10 cover almost all range of the portion with recession and projection on respective wall surfaces 3, 4, 5, 6. Thus, the cleanup work after discharging can be largely simplified although it is not omitted. COPYRIGHT: (C)2007,JPO&INPIT
|