摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a recovery support method and system, capable of realizing rapid recovery works, by saving man-hours needed for the field survey and preparation work of a specification required for recovery construction at disaster or automating the work therefor. <P>SOLUTION: In the disaster recovery support method, a plan, a longitudinal section view and a cross-sectional view regarding an optional area prior to the occurrence of the disaster are acquired; they are associated with quantity/unit price data; three-dimensional measurement image data in the area after the occurrence of the disaster are acquired; an integrated control diagram, displayed by superposition with the plan, is displayed and outputs the specification required for a disaster restoration work regarding a specified part of the integrated control diagram. The disaster recovery support system make the plan associated, the longitudinal section view and the cross-sectional view with the quantity/unit price data regarding the optional area prior to the occurrence of the disaster, creates the integrated control diagram, in which the plan with signs is superimposed on the three-dimensional measurement image data, after the occurrence of the disaster and outputs the specification required for the disaster recovery work about the specified part of the integrated control diagram. <P>COPYRIGHT: (C)2007,JPO&INPIT</p> |