摘要 |
A method for constructing a wind turbine blade for installation at a wind farm location is described herein. In accordance with the present method, primary components of the wind turbine blade, such as, for example, the root and the spar caps, are manufactured in a first manufacturing facility. Secondary components such as, for example, the skin, are manufactured at a second manufacturing facility, which is closer to the wind farm location than the first manufacturing facility. The manufactured primary and secondary components may be assembled in an assembly location near the wind farm.
|