摘要 |
A reinforcing method of a slope of a building is provided to prevent loss of earth and sand in the heavy rain by laying porous pipes under the ground, installing a horizontal bar and a vertical bar and mounting a net. A horizontal bar(300) is inserted to the ground, and plural horizontal bars are installed in a slope. A porous pipe(500) is installed through a penetration hole of the horizontal bar under the ground, and extended by a coupler integrally formed with a pipe penetrating a center of a circular plate. The porous pipe is installed along the slope by digging a groove, and a vertical bar(400) is contracted to the horizontal bar and installed by placing a horizontal angular member in an upper staple-shaped groove of the horizontal bar and integrally forming a vertical angular member in a lower part of the horizontal angular member. The porous pipe is connected to an insertion hole of the other porous pipe to discharge rainwater to a drain port, and the other porous pipe is installed along a concrete retaining wall. A net member(700) with a frame and a mesh is mounted on the horizontal and vertical bars, and grass, flowers and trees are planted by stacking earth and sand. The horizontal bars are arranged according to the gap of the vertical angular members of the vertical bar. |