发明名称
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a high void subgrade material contributed to the improvement of riding in a railway track, the reduction of maintenance work, the facility of use in a road, a park, various kinds of athletic equipments, etc. and a semi-rigid subgrade construction method. <P>SOLUTION: The subgrade material having water-granulated slag, cement and fly ash as main components mixed with silicon dioxide, aluminum oxide and magnesium oxide is manufactured, the subgrade material is laid and leveled to a set height, and a proper amount of water is sprayed thereon to solidify to lightly roll on. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p>
申请公布号 JP3826899(B2) 申请公布日期 2006.09.27
申请号 JP20030137336 申请日期 2003.05.15
申请人 发明人
分类号 E01C3/00;C04B18/08;C04B18/14;C04B22/06;C04B28/02;C04B28/08;C04B111/50;E01B1/00;E01C7/10;E01C13/02;E01C13/06 主分类号 E01C3/00
代理机构 代理人
主权项
地址