发明名称 PRODUCTION SYSTEM FOR WATER HEATER SYSTEM
摘要 <p><P>PROBLEM TO BE SOLVED: To achieve prefabrication around piping by providing a header device and a central piping device to simplify the piping of a multi-function water heater system. <P>SOLUTION: An underfloor structural drawing indicating an underfloor structure of a building is taken in an information processing device determining a piping route of the water supply system, the piping route is determined so that a functional header and a functional unit connected with the water heater system can be stored in one casing, the functional header and the function unit are incorporated in the housing on the basis of contents determined by the information processing device, members around the piping are prepared by adjusting lengths of piping materials, selecting joints, or the like, and they are assembled before being carried to a construction job site. <P>COPYRIGHT: (C)2006,JPO&NCIPI</p>
申请公布号 JP2006242566(A) 申请公布日期 2006.09.14
申请号 JP20060149898 申请日期 2006.05.30
申请人 NORITZ CORP 发明人 INOUE TAKASHI;NAKAJO SHINICHIRO;TANAKA AKIRA;MATSUOKA KENJI
分类号 F24D17/00;E03C1/02;F24H1/00 主分类号 F24D17/00
代理机构 代理人
主权项
地址