发明名称 TARGET ACHIEVE PROGRESS MANAGEMENT METHOD
摘要 <P>PROBLEM TO BE SOLVED: To compare a numerical target with a completion expected value, to calculate the achievement ratio, and to keep and use the result. <P>SOLUTION: Data file for storing target numerical information as a target object is held in a desired system device, a site numerical information created and processed in the system device and a state at a desired time are stored in the data file or a different data file, and held in the system device. A first desired management unit is extracted from data of the target numerical information, a second desired management unit is extracted from data of the site numerical information, and the progress stage is determined based on the data of the site numerical information. The site numerical information is collected based on the determination result, the result is stored in the data file or the different data file and held in the system device, and the data of the target numerical information is checked against and compared with data of the collection result of the site numerical information using the first and second management units. <P>COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006221321(A) 申请公布日期 2006.08.24
申请号 JP20050032828 申请日期 2005.02.09
申请人 CANON INC 发明人 WATANABE TATSUYA
分类号 G06Q10/00;G06Q10/06;G06Q50/00 主分类号 G06Q10/00
代理机构 代理人
主权项
地址