摘要 |
PROBLEM TO BE SOLVED: To enhance wave-dissipating efficiency of a breakwater with a structure of a combination of a slit caisson and a wave-dissipating layer. SOLUTION: The breakwater A comprises the slit caisson 10, and the wave-dissipating layer 20 which is provided behind the slit caisson 10. The wave-dissipating layer 20 is composed of a plurality of blocks 20a, 20b, etc. , and grain sizes of gravel as a filler, accumulated on the blocks 20a, 20b, etc. , are made different from one another. For example, the central grain sizes are made different from one another. The central grain size of the grain on the block 20a, which is provided right behind the slit caisson 10, is made larger than that of the gravel accumulated on the blocks 20b etc. COPYRIGHT: (C)2006,JPO&NCIPI
|