发明名称 METHOD OF ERECTING AND REMOVING BRIDGE GIRDER, AND BRIDGE GIRDER CONSTRUCTION APPARATUS
摘要 PROBLEM TO BE SOLVED: To provide a method of erecting and removing a bridge girder, according to which working hours in a narrow construction field can be shortened and the construction field can be evacuated in a short time, and to provide a bridge girder construction apparatus for use in the method. SOLUTION: Erection work of the bridge girder G is carried out by the bridge girder construction apparatus 1. First, while an erection girder 10 is borne by a carrying truck 20, a front portion of the erection girder 10 is forwarded from a construction completed section S to an erection scheduled section C, and by lowering a lower cylinder portion 33A to bear the front portion, the erection girder 10 is erected. Then the bridge girder G mounted on the erection girder 10 is forwarded to the erection scheduled section C by a girder forwarding truck 12, and by lowering the erection girder 10, the bridge girder G is set on an upper end P of a bridge pier. After completion of the erection, while being borne by the carrying truck 20, the erection girder 10 is withdrawn from the erection scheduled section C to the construction completed section S. Removal work of the bridge girder is carried out essentially by carrying out a procedure reverse to the erection work. COPYRIGHT: (C)2006,JPO&NCIPI
申请公布号 JP2006214209(A) 申请公布日期 2006.08.17
申请号 JP20050029412 申请日期 2005.02.04
申请人 NODA JIDOSHA KOGYOSHO:KK;TEKKEN CONSTR CO LTD;CENTRAL JAPAN RAILWAY CO 发明人 YAMAGUCHI MITSURU;SUZUKI KENICHI;KOBAYASHI JUN;SHIMAZAKI SHIGEKAZU;ONO YOSHIHIKO;UTSUNOMIYA AKIRA;ONO MASAKI;KUMAHARA SHINICHI;NODA SHIGEHIDE
分类号 E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址